Old Cascade Tunnel
Posted by: Groundspeak Premium Member Blue J Wenatchee
N 47° 44.909 W 121° 07.395
10T E 640673 N 5290051
The Original Cascade Tunnel
Waymark Code: WMGRG
Location: Washington, United States
Date Posted: 07/08/2006
Published By:Groundspeak Regular Member kbarhow
Views: 408

The Original Cascade Tunnel was finished in 1900 and was for the purpose of removing 8 switchbacks to get over the mountains. It was 2.6 miles long and had a grade of 1.7% (1 in 58.8ft). After the Wellington Avalanche in 1910 concrete snowsheds were constructed to help with snow control. In 1929 the New Cascade Tunnel at 7.8 miles was completed below the old tunnel and all switchbacks and the old tunnel were abandoned.
Construction: Concrete

Condition: Fair

Rail Status: No

Current status: Unused & Hazardous

Original Use: Freight

The "Other End": N 47° 46.333 W 121° 04.726

Tunnel Length: 14,508.00

Suggested Parking Area: N 47° 44.826 W 121° 07.661

Terrain:

Website: [Web Link]

Date Built: December 10, 1900 (opened)

Date Abandoned: January 12, 1929

Visit Instructions:
Tell of your visit. Did you find anything of interest? Unique photos are encouraged.
Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest Abandoned Train Tunnels
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
Date Logged Log User Rating  
B+L visited Old Cascade Tunnel 10/31/2009 B+L visited it
Qt.man visited Old Cascade Tunnel 07/06/2008 Qt.man visited it

View all visits/logs