
Ormiston Bridge - Auckland, New Zealand
S 36° 57.885 E 174° 54.497
60H E 313789 N 5906993
At a cost of $6.5 million this is New Zealands first cable-stayed traffic bridge.
Waymark Code: WM8XFV
Location: North Island, New Zealand
Date Posted: 05/26/2010
Views: 8
A cable-stayed bridge spanning 80m provided an appropriate conceptual idea which could touch the ground lightly, having two angled tower pylons each 45 metres high which could then support two 2-lane carriageways and footpaths. Thus, a void could be created to allow light into the park below and avoid a large dark ‘footprint’. Construction is concrete pylons and deck, steel cable supports, stainless steel components and ‘beacons’ at the pylon tops to provide a reference point, particularly at night, when the structural system is celebrated with a comprehensive lighting system.
Date Completed: 10/11/2008
 Usage: Automobile
 Length: 80 metres
 WWW: [Web Link]

|
Visit Instructions:
Log your find with the picture of the bridge that you like. No gpsr required in the photo...different seasons and lighting for the pictures is what will be the goal.
Recent Visits/Logs:
There are no logs for this waymark yet. |
|
|