Skip to content

SideTracked - Polegate Traditional Geocache

This cache has been archived.

Long Man: As the owner has not responded to my previous log requesting that they check this cache, I'm archiving it.

Andy
Long Man
Volunteer UK Reviewer - Geocaching.com
Geocaching.com Guidelines
Geocaching.com Help Centre
UK Geocaching Information

More
Hidden : 8/13/2019
Difficulty:
1.5 out of 5
Terrain:
1 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


About SideTracked Caches

This cache belongs to the SideTracked series. It is not designed to take you to a magical place with a breath taking view. It's a distraction for the weary traveller, but anyone else can go and find it too. More Information can be found at the SideTracked Website

About Polegate Station


First station

The first station opened on 27 June 1846 when the London and Brighton Railway built a line from Brighton to Hastings via Lewes. The station was built at Polegate to serve the nearby towns of Hailsham and South Bourne, the latter now part of Eastbourne. The first station was on the site of the present station. It then became a junction station on 14 May 1849 when an east facing branch headed northwards to Hailsham was opened and another southwards to Eastbourne, the station had enlarged to three through platforms and a bay platform for Hailsham services. The station then also had a one road engine shed and small freight yard complete with granary and weighing machine.

Second station

In 1881 the second station was opened in connection with the construction of a new westward facing line to Hailsham and the 1880 extension of the Cuckoo Line to Eridge, and the re-aligned branchline to Eastbourne which the present line follows today. The second station had four through platforms. The East Coastway line through Polegate was electrified in 1935 bringing in faster more frequent services. In 1965 the Cuckoo line north of Hailsham was closed followed in 1968 by complete closure of the branch to Hailsham. On 6 January 1969 the spur line to Pevensey (Stone Cross Junction) was closed and the up line was lifted, leaving the down line open for departmental trains until 1974 when the line became a mile long engineers siding with access only from Stone Cross Junction, this was then lifted in August 1984. and once extensive goods sidings were gradually closed and removed.
The station closed in 1986 when a newer station opened 440 yards west, although caused controversy when the subway under the station connecting the platforms was also closed as it offered a short cut for non rail travellers to cross from one side of the town to the other without walking towards the high street and using the level crossing. The level crossing is the only means from crossing from one side of the town to the other. The street level building was demolished in May 2017.

Present station

The current building is the third station to be built in Polegate and is on the site of the original station. It was completed in 1986 by Network SouthEast, and officially opened by Ian Gow in 1987. The station has a booking hall, and three waiting rooms. A footbridge connects both platforms although step-free access is available by the Level Crossing. The site of the goods yard is now developed with a shopping precinct and car park to the north of the station and a housing estate to the south-east of the station.
The closed lines to Hailsham and Pevensey are still evident. The trackbed of the branch to Heathfield is now a cycle path – Cuckoo Trail – beginning at the north end of the town. The trackbed to Pevensey is mostly intact with the A22 road cutting though the route.

Additional Hints (Decrypt)

Uvqqra haqre fbzr ybbfr bhg bs cynpr pbapergr

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)