Skip to content

le panorama de la gare maritime Traditional Geocache

Hidden : 11/3/2017
Difficulty:
1.5 out of 5
Terrain:
2 out of 5

Size: Size:   other (other)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

une cache pour remplacer celle qui etait presente mais archivée car disparue. le point de vue est sympa et mérite bien une cache, merci d'en prendre soin pour qu'elle perdure

A cache to replace the one that was here before but archived because she disappeared. the point of view is nice and deserves a cache, thanks to take care of it

 

La gare maritime transmanche de Cherbourg est un équipement portuaire de Cherbourg-en-Cotentin.

Elle est destinée à accueillir les passagers traversant la Manche par car-ferry. Elle remplace la précédente gare maritime transmanche, mise en service en mai 1964 avec l'ouverture de ce trafic dans le port de Cherbourg.

Elle entre en service le 22 juin 1994, à 4 h 30. Les premiers passagers à transiter par le nouveau terminal sont ceux du Stena-Normandie, arrivé dès 5 h.

 
Hall des agences maritmes.

Sa construction coûte 50 millions de francs, 27 millions pour le bâtiment lui-même et 23 autres pour l'aménagement de 17 hectares de terre-pleins autour. L'investissement est partagé entre la Chambre de commerce de Cherbourg, la Communauté urbaine de Cherbourg, le Conseil régional de Basse-Normandie et le Conseil général de la Manche.

Elle est prévue pour accueillir 4 millions de passagers par an et 250 000 véhicules.

« Il n'aura fallu que quelques heures aux cinq compagnies maritimes basées à Cherbourg pour transférer leurs services d'une gare maritime à l'autre ». Ces compagnies sont P&0, Pandoro, Truckline Ferries, Stena Line et Irish Ferries.

aujourd'hui, il reste 3 compagnies presentes sur le port, Brittany Ferries sur le transmanche ainsi que Stena Line et Irish Ferries pour les liaisons vers l'Irlande.

« L'augmentation de la taille des ferries nécessitait une extension de la taille des parcs d'embarquement, explique Benoît Le Cacheux, président de la Chambre de commerce. Lorsque quatre bateaux chargent en même temps, nous devons disposer à terre de 2 200 places de parking. ».

Construite 700 mètres plus loin vers l'est que la précédente, la nouvelle gare maritime transmanche est reliée au centre ville par des bus circulant toutes les demi-heures au moment des escales.

Source: http://www.wikimanche.fr

--------------------------------- ENGLISH SPOKEN ------------------------------------------------

The cross-Channel ferry terminal in Cherbourg is a port facility in Cherbourg-en-Cotentin.

 
It is intended to accommodate passengers crossing the Channel by car ferry. It replaces the former cross-Channel ferry terminal, commissioned in May 1964 with the opening of this traffic in the port of Cherbourg.
 
It entered into service on 22 June 1994, at 4.30 am The first passengers to pass through the new terminal are those of Stena-Normandy, who arrived at 5 am.
Its construction costs 50 million francs, 27 million for the building itself and 23 others for the development of 17 hectares of medians around. The investment is shared between the Chamber of Commerce of Cherbourg, the Urban Community of Cherbourg, the Regional Council of Lower Normandy and the General Council of the Channel.
 
It is scheduled to accommodate 4 million passengers per year and 250,000 vehicles.
 
"It took only a few hours for the five shipping lines based in Cherbourg to transfer their services from one ferry terminal to another." These companies are P & O, Pandoro, Truckline Ferries, Stena Line and Irish Ferries.
Today, 3 company are still here, Brittany Ferries for Channel crossing,  Irish Ferries and Stena Line To ship To Ireland.
today, there are 3 companies present on the port, Brittany Ferries on the cross-Channel as well as Stena Line and Irish Ferries for the connections to Ireland.
 
"The increase in the size of the ferries required an extension of the size of the boarding parks," explains Benoît Le Cacheux, president of the Chamber of Commerce. When four boats load at the same time, we need to have 2,200 parking spaces on the ground. ".
 
Built 700 meters further east than the previous one, the new cross-Channel ferry terminal is connected to the city center by buses running every half hour at the time of the stopovers.
 

Additional Hints (Decrypt)

Yrf crgvgf ar cbheebag cnf y'nggencre frhy/ fznyy crbcyr jvyy abg or noyr gb pngpu vg nybar

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)