Skip to content

Smart Road View Traditional Geocache

This cache has been archived.

YetAnotherReviewer: There has been no response from the CO. Without recent communication on future cache availability, we can't hold this area for you any longer and so we are archiving this cache. Please pick up any remaining cache bits as soon as possible.

Thanks for your understanding,

Thanks,
YetAnotherReviewer
Volunteer Geocaching.com Reviewer
Known Virginia Geocaching Guidelines

More
Hidden : 5/26/2009
Difficulty:
1.5 out of 5
Terrain:
1.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

This is a P & G under the Smart Road. BYOP

The Smart Road, also sometimes called the Smart Highway, is a 2.2-mile-long 2-lane highway completed in 2002 near Blacksburg, Virginia, home of Virginia Tech (VPI&SU), and the highway is being used as a transportation research facility for highway and bridge research as well as for vehicular systems research and for Intelligent Transportation Systems (ITS) research. The Smart Road is a joint project of the Virginia Department of Transportation (VDOT), the Virginia Tech Transportation Institute (VTTI), and the Federal Highway Administration (FHWA). This initial highway section was built on a 4-lane right-of-way with the intention that it would be a research facility not usable by public traffic, but that the highway would eventually be extended and completed as a 5.7-mile-long, 4-lane limited-access highway linking Interstate 81 and Blacksburg, Virginia, usable by standard public traffic of automobiles, trucks and buses. The Smart Road has two main purposes: 1) to provide a direct route for motorists between I-81 and Blacksburg, and 2) to offer researchers and product developers a state-of-the-art research lab for testing new transportation technologies.

The 5.7-mile-long Blacksburg-Roanoke Connector.
The northernmost 2.2 miles has been built as the current Smart Road testbed.

Groundbreaking took place in July, 1997, construction on the first 1.7-mile segment of the road was completed in December 1999, and the second 0.5-mile segment, including the high-level bridge over Wilson Creek, was completed in May 2002.
(visit link)

Additional Hints (Decrypt)

Thneqrq - jngpu jurer lbh fgrc!!!

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)