Most dr. Franja Tuđmana

i

Most Dubrovnik

Ukupna dužina     518 m
Visina mosta     istočni pilon 141,5 m
most 50 m

Most dr. Franja Tuđmana ili Most Dubrovnik povezuje dvije obale zaljeva Rijeke dubrovačke.

Ideja o izgradnji mosta preko Rijeke dubrovačke stara je oko 30 godina, a sama realizacija je počela 1989. godine izgradnjom prilaznih cesta od naselja Lozica sa zapadne te dubrovačkog gradskog predjela Nuncijata s istočne strane. Domovinski rat je spriječio daljnju gradnju. S gradnjom se nastavilo 1998., a most je završen i pušten u promet u svibnju 2002. godine.

Imenovanje mosta je nakon njegove gradnje postalo dijelom spora između dvije političke struje. Spor još uvijek traje, a trenutno se na zapadnom prilazu mostu nalazi tabla s nazivom Most dr. Franja Tuđmana, dok se s istočne strane nalazi tabla Most Dubrovnik.

Most je ovješenog tipa i sastoji se od dva dijela prednapetog grednog sklopa sa zapadne strane i glavnog nesimetričnog sklopa s ovješenom spregnutom gredom na istočnoj strani. Na zapadnoj strani, na prilaznoj cesti izgrađen je vijadukt dužine 66 metara. Dužina samog mosta je 518 metara. Slobodna visina mosta iznosi 50 m.

Do izgradnje mosta promet prema zapadnom ulazu u grad Dubrovnik se odvijao Jadranskom turističkom cestom kroz područje Rijeke dubrovačke, a gradnjom mosta taj put se skratio za oko 9 kilometara te na taj način pridonio bržem razvoju dubrovačkih prigradskih naselja Lozica, Štikovica, Vrbica, Zaton i Orašac te naselja općine Dubrovačko primorje.

Napis je preuzet sa Wikipedije. Hvala.

 

Most dr. Franja Tuđmana

and

Most Dubrovnik

Design     deck cable-stayed bridge
Total length     518 m (1,699 ft)
Width     14.2 m (47 ft)
Longest span     304.5 m (999 ft)
Clearance below     50.3 m (165 ft)
Opened     2002
Toll     no
Franjo Tuđman Bridge, at the western approach to Dubrovnik and next to the Port of Gruž

The Franjo Tuđman Bridge (Croatian: Most dr. Franje Tuđmana) is a cable-stayed bridge carrying the D8 state road at the western approach to Dubrovnik, Croatia across Rijeka Dubrovačka near Port of Gruž. The original bridge design was developed in 1989, however construction was stopped at the onset of the Croatian War of Independence. The bridge has been redesigned by Structures Department of the University of Zagreb Faculty of Civil Engineering and the design employed has been developed by Zlatko Šavor.

The bridge is 518-metre (1,699 ft) long, measured between the abutments. Substructure of the bridge consists of the abutments, a pier on the western shore supporting a pretensioned girder and an anchoring pier on the eastern shore.

Supported structure on the cable-stayed portion of the bridge consists of a composite girder, an A-shaped pylon and the cable stays. Overall span of the girder is 324.7 m (1,065 ft). Concrete roadway slab is of generally constant depth of 25 cm (10 in). A total of 38 cable stays have been executed, comprising 27 to 61 steel wire cables placed in protective polyethylene pipes.

The pylon is 141.5 m (464 ft) tall, measured from the top surface of the foundations. It comprises a box cross section of varying size. An additional box girder is executed just below the suspended structure providing it an additional support as well as bracing the pylon legs. The cable stays are anchored to the top of the pylon. A special opening has been executed in one of the pylon legs, next to the sidewalk, providing access to the inside of its cross-section, where there are rungs facilitating climbing to the top of the pylon, where another opening on its top allows replacements of the anchors, should that become necessary.

The western part of the bridge comprises a pretensioned girder of variable depth (3.25 m (10.7 ft) at the abutment, 8.22 m (27.0 ft) at the pier and 3.2 m (10 ft) at the end of the cantilever).

Construction of the bridge started in October 1998. The construction works were carried out by Walter Bau AG and Konstruktor, Split. Construction was completed in April 2002, and the bridge was officially opened on May 21, 2002. The bridge construction costs were reportedly 252 million Croatian kuna (c. US$31 million) making Franjo Tuđman Bridge the most expensive bridge in Croatia. Opening of the bridge was characterized by delays due to various permit requirements, so the opening and dedication ceremony was delayed five times.
Naming controversy

Initially, Hrvatske ceste who financed the construction named the bridge Dubrovnik Bridge (Croatian: Most Dubrovnik). However, even before the official opening of the bridge, there was some controversy regarding the name of the bridge, as mayor of Dubrovnik expressed a request that the bridge be named Franjo Tuđman Bridge instead. The controversy grew on May 10, 2002, one day before a scheduled opening ceremony, when traffic signs that are supposed to display name of the bridge were shown on the Croatian TV, unsure of actual name of the bridge. Hrvatske ceste, the operator of the bridge placed signs saying Dubrovnik Bridge, but next to those were similar signs indicating name Franjo Tuđman Bridge.

Text is copied from Wikipedia, Thanx for info.