D3 v krátkosti

Dne 2.10.2008 byla zahájena stavba cca. 25 km dlouhého úseku dálnice D3, stavby 0306, 0307A,B,C, 0308A,B. Spolecnost Pragoprojekt je projektantem stavby 0308A a vykonává cinnost technického dozoru stavby.

Datum zahájení:

9.9.2008

Datum ukoncení:

30.9.2011

Celkové náklady projektu:

14 463 898 518 Kc

Délka:

25 km

Výstavba a fakta o D3:

Výstavba úseku dálnice D3 Tábor–Veselí nad Lužnicí zahrnuje soubor staveb, jehož realizací jde k vybudování približne 26 kilometru dálnice D3, a to v regionu velké jihoceské aglomerace, tedy úseku, který je po soucasné silnici I/3 považován za jeden z nejhorších, co se týce dopravní zatíženosti. Z intenzit dopravy, které byly zjišteny pri pravidelném celostátním scítání dopravy v roce 2005, vyplývá, že stávající silnice I/3 mezi Mirošovicemi a Benešovem je již dnes pro stávající provoz kapacitne nevyhovující. Denní intenzity v tomto úseku dosahovaly v roce 2005 hodnot pres 24 tisíc vozidel/den v obou smerech. Dálnice D3 se po svém dokoncení stane soucástí doplnkové síte evropských dopravních koridoru TINA, pricemž pres naši republiku prochází také mezinárodní silnicní tah E55, který vede ze Skandinávie pres Nemecko, Cesko, Rakousko a Itálii do Recka. Celý tento tah je v provozu v dálnicních parametrech krome úseku dálnice D8 pres Ceské stredohorí a úseku dálnice D3 Praha–Linec. D3 soucasne prebere funkci kapacitního spojení Prahy s oblastí jižních Cech, napojuje Táborsko a Ceskobudejovicko na republikovou sít dálnic a rychlostních silnic a ve smeru na jih na silnicní a dálnicní sít v Rakousku. Celková délka tahu dálnice D3 a navazující rychlostní silnice R3 mezi Prahou a státní hranicí s Rakouskem je približne 171,40 km. Úsek trasy mezi Prahou, Táborem a Ceskými Budejovicemi až po mimoúrovnovou križovatku (MÚK) Trebonín je pripravován jako dálnice D3 a úsek mezi MÚK Trebonín a státní hranicí s Rakouskem jako rychlostní silnice R3. Trasa je rozdelena na 12 stavebních úseku 0301 až 0312, z nichž stavby v pokrocilém stadiu prípravy nebo ve výstavbe jsou dále cleneny na dílcí stavební cásti, zarucující rychlejší a prehlednejší financování. Navržené šírkové usporádání je dle platné normy uvažováno v kategorii D 27,5/120 pro dálnici a R 25,5/120 pro rychlostní silnici.

O keši:

Keš se nacházi na silnicním moste ve smeru na Žíšov.Když popojdete pár kroku tak skvele uvidíte dálnici a co se na ní všechno deje.V keši jsou FTF ,STF a TTF karticky a pro pet dalších tež.

Tato keš patrí do série Žíšov, nezapomente si z logbooku opsat bonusové císlo.

Kaplicka sv.Anny Vyhled na Kompresni Stanici Plynovodu Stavba dalnice Strelnice
Bonusová keš: Sobeslavska blata 10 - Zisovská série

This cache belongs to the set Zisov, don't forget for a bonus number (it's in logbook).

This cache belongs to the set Zisov, don't forget for a bonus number (it's in logbook).

D3 in brief

On February 10, 2008, the construction of approx. 25 km long motorway section D3, building 0306, 0307, B, C, 0308, B. The company is a designer of buildings Pragoprojekt 0308 and acts as technical supervision of construction.

Starting date:

September 9, 2008

End date:

September 30, 2011

Total project cost:

14,463,898,518 CZK

Length:

25 km

Construction and facts about D3

Construction of motorway section D3 Tabor-Veseli the River includes a set of buildings, whose implementation will build approximately 26 kilometers of highway D3, in the South Bohemia region of the large agglomerations, a segment that is currently on a road I / 3, considered one of the worst, what With regard to traffic workload. The traffic intensity, which were detected during regular national traffic census in 2005 shows that the existing highway I / 3 between Mirošovice Benešov and is already operating capacity of existing non-compliant. Daily effort in this sector reached in 2005 over 24,000 vehicles per day in both directions. D3 highway after its completion, will become part of the complementary network of European transport corridor TINA taking over our country through the international road E55 turn that leads from Scandinavia through Germany, Czech Republic, Austria and Italy to Greece. This whole move is in use in highway parameters except the D8 motorway section and through the Czech Highlands section of D3 motorway Prague-Linz. D3 simultaneously take over the function of capacitance between Prague and regions of South Bohemia, Ceské Budejovice and Tabor joins the republic's network of motorways and expressways and in the south of the road and motorway network in Austria. The total length of the tension D3 motorway and expressways connecting R3 between Prague and the Austrian border is approximately 171.40 km. Section of the route between Prague, Tabor and Ceske Budejovice after interchanges (GSI) is prepared as Trebonín D3 motorway section between GSI and Trebonín and the border with Austria as expressways R3. The route is divided into 12 construction sections 0301-0312, which works in an advanced stage of preparation or under construction are further divided into sub-parts building, ensuring faster and easier financing. Width proposed arrangement is considered by current standards in the category D 27.5 / 120 for highway and Rs 25.5 / 120 for highway.

About the cache

The cache is located on the road bridge in the direction of Žíšov.Když step a few steps and you will see a great highway and what is happening to her.In a cache are FTF,STF and TTF cards and for another five geocachers too.

Additional Hints (Decrypt)

PM -wnoyxb arcnqn qnyrxb bq fgezh

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)