|
Joe the Plumber was busy finishing up plumbing the new,
multi-million dollar mansion in Newport. With 5 bathrooms, a
kitchen, utility room, and an outdoor wet bar, he definitely had
his hands full! Usually he could keep his parts lists in his head,
but this job was pushing his aging memory. For this job he made a
list, breaking each installation out separately. Now all he had to
remember is how everything fit together!
Upstairs:
- 1 elbow, 1 tee, 4 pipes
- 1 pipe
- 2 elbows, 1 tee, 5 pipes
- 2 elbows, 1 tee, 5 pipes
- 4 elbows, 5 pipes
- 3 elbows, 1 tee, 5 pipes
- 4 elbows, 5 pipes
Downstairs:
- 1 elbow, 2 pipes
- 1 pipe
- 1 pipe
- 4 elbows, 5 pipes
- 4 elbows, 4 pipes
- 4 elbows, 1 tee, 6 pipes
- 4 elbows, 5 pipes
Joe noticed that two projects for the upstairs used the same
parts as for two downstairs, but is pretty sure the upstairs
installations were smaller.
You can check your answers for this puzzle on
Geochecker.com.
Please replace the cache as you found it.
|